Why best manager failed
The sacking of famous manager, Maurinho at famous club MenU remind of ongoing projects which fail and looks nowhere to complete on time.
Scenario and reason of failure almost same. Jose was best manager in the world with best club in the world. They have expertise and money to progress but stuck.
When staff or players start didn't give their hundreds persen commitment, then performance will drop. It made worst when technical or tactical also didn't resolve or wrong.
Change team head was normal solutions taken by owners buat staff or players still the same.
As MenU case now they performed with new boss but same players.
Same case when i rescue few projects with same staff which finally completed.
But what we always lack was timing gor change. Sometimes damage already bad and very costly.
Monday, February 5, 2018
Awareness
Yesterday i experiance burst of water pipe that hit by sheetpiling works.
Eventhough it was already not that there was a pipe but lack of awereness before work start it resulted the pipe was hit.
Almost twenty years ago i experiance even worst. Main pipe supply from reservoir was burst and water go as high as 23 storey of building nearby.
Now everyday i worry what will happened to services underneath as team not really check details before work start.
Thursday, January 11, 2018
Lost of skills
Project management concepts introduce by capitalist had made our construction industry lost their basics skills.
Pity my fellow head of site nowadays.
Friday, September 29, 2017
When nature give a lesson
Our recent flash flood had exposed few things.
Besides no regular maintainance on silt trap, silt fence and earth drain, outflow pipe also not installed properly as photo shown.
Look the way pipe was construct, the constructor and supervisor dont care weather it will function or not.
For them, work had completed and they dont bother what will happened next.
Yesteday nature had give us very good and costly lesson.
Wake up guys !!!!@
Flash flood
Construction area for highway construction always exposed to flash flood. It will become news if any of houses nearby affected by flood.
Contractor must have team to manage this and we had experiance this week.
This time during september and december in malaysia was monsoon season and it can be fatal to construction team if it not been handle properly.
Saturday, September 23, 2017
Keciknya dunia
Hari ni pergi kenduri x-bumihiway Halim Saleh.
Dia pernah transit Di Gebeng selepas siap project Di serawak. Selepas sebulan dua Di Gebeng, dia ke project Gong Kedak ganti kapten.
Begitu keciknya dunia construction Di Malaya, sekarang anak dia Yang kahwin Hari ni berkerja Di project site ampang sekarang ni.
Dulu bapak nya bos, sekarang Aku Bo's anaknya.
Thursday, September 21, 2017
Fresh engineer
Thursday, September 21, 2017
Cerita dua Orang fresh enginiar
Keduanya Di bekalkan oleh company motosikal.
Si azmel ni bila nak pergi site selalu tunggu Dan tumpang sapa2 Yang nak ke site. Kadang2 tumpang orang Fenki. Manakala si ridwan pulak guna kereta sendiri bila ke site.
Aku jawap, saya pun tak tau tapi dah suruh Dan depa tak mau jugak.Kau panggil diaorang tengahari Hari ni, Kita jumpa.
Last sekali dia Tanya Aku, Kau dulu start kerja Naik apa? Aku jawab, motolah. Apalagi untuk fresh2 ni. Takan nak Naik Jimmy pulak.
Dia pun belasah dua2 enginiar tu.
Tapi korang mesti bertanding dengan Moto ni.
Finally
Today 22.9.2017, we finally start bore hole first point at median of the road.
It was very long process and journey which sometimes us frustrated.
But that the reality of life during project execution. Not all plan happened smoothly.
Tuesday, September 12, 2017
Blaming game
This photo show reality at site projects.
Site team especially site engineer will be blame if anything goes wrong.