Construction area for highway construction always exposed to flash flood. It will become news if any of houses nearby affected by flood.
Contractor must have team to manage this and we had experiance this week.
This time during september and december in malaysia was monsoon season and it can be fatal to construction team if it not been handle properly.
Talking, writing and sharing about my involvement and experiance in construction as hands-on contractor.
Friday, September 29, 2017
Flash flood
Saturday, September 23, 2017
Keciknya dunia
Hari ni pergi kenduri x-bumihiway Halim Saleh.
Dia pernah transit Di Gebeng selepas siap project Di serawak. Selepas sebulan dua Di Gebeng, dia ke project Gong Kedak ganti kapten.
Begitu keciknya dunia construction Di Malaya, sekarang anak dia Yang kahwin Hari ni berkerja Di project site ampang sekarang ni.
Dulu bapak nya bos, sekarang Aku Bo's anaknya.
Thursday, September 21, 2017
Fresh engineer
Thursday, September 21, 2017
Cerita dua Orang fresh enginiar
Keduanya Di bekalkan oleh company motosikal.
Si azmel ni bila nak pergi site selalu tunggu Dan tumpang sapa2 Yang nak ke site. Kadang2 tumpang orang Fenki. Manakala si ridwan pulak guna kereta sendiri bila ke site.
Aku jawap, saya pun tak tau tapi dah suruh Dan depa tak mau jugak.Kau panggil diaorang tengahari Hari ni, Kita jumpa.
Last sekali dia Tanya Aku, Kau dulu start kerja Naik apa? Aku jawab, motolah. Apalagi untuk fresh2 ni. Takan nak Naik Jimmy pulak.
Dia pun belasah dua2 enginiar tu.
Tapi korang mesti bertanding dengan Moto ni.
Finally
Today 22.9.2017, we finally start bore hole first point at median of the road.
It was very long process and journey which sometimes us frustrated.
But that the reality of life during project execution. Not all plan happened smoothly.
Tuesday, September 12, 2017
Blaming game
This photo show reality at site projects.
Site team especially site engineer will be blame if anything goes wrong.
Thursday, August 24, 2017
Poor premix work
Performance of premix patching by services contractor never improved since i start working 30 years ago.
They still lack of knowledge and skills workers to carry out the work. Even worse when premix send to site already cold and surely it wont be good when we compact with small plate compactor.
Saturday, August 5, 2017
you are fired.
people left job or project with certain reason but when things not run smmothly or person become stumbling block, he will be removed.
i have seen before and seen here again.
This project had gone one third of period already but progress was merely below ten persen. We had seen chief resident engineer, project managers been removed from their position. Even consultant also not save. Every layer are doing overhauling. Its unfortunate for certain people that fall into the above category.
hope the latest victim survived and project going to fly.
Sunday, April 9, 2017
panic button
we still struggle to start physically. Approval of site and drawings still outstanding.
My normal experiance all issue above always resolve within four month after contractor enter site. Until now no panic button really been pressed.
My conclusion, leadership to drive the project to achive objective are most important. Until then, everybody will move within their own territory.
I feel miserabble and sick to wait for all this.
Saturday, November 26, 2016
survey
be it before design stage, during designing, after contractor entering site, during construction and after completion.
we always have problems when we start work. its more complicated when we have many designer and contractors within one package. Luckily we have only one licened survey.
all survey works must accordance to malaysian jabatan ukur JUPM data.
Saturday, October 15, 2016
starting project
Starting projects always not an easy things. Furthermore when we are on joint venture which this is first time we are going to implement consolidate joint execution of project. Our first joint venture was being handover to one partner to execute.
First joint venture agreement which need to agree and give to client. Next was agreement how to separate the builders work. Which partner want to do this and that and equivalent to partner equity. This matter i found was very tiring exercise which finally took almost two months to resolve!!!
Next was finding contractor and consultant site office. It made worst when we had no area to construct site office and to settle with rental building along 2 kilometer of our site. And consultant show their 'lancy' not to accept our proposal.
After settle with location, now to arrange renovations, table, chairs and others equipments to made our site office a better place to work.